A variety of building materials stores in Kaichun have various promotional methods. The price of building materials is lower than that in the second half of the year. The owners can purchase more affordable building materials. The decoration company has sufficient manpower to better guarantee the quality of the construction site and the construction period, and will not be fatigued.
Decorate and decorate
In early spring, the impact on wood is mainly reflected in both temperature and humidity. If the temperature is too low or too high, adverse reactions of the material may occur, curling or even cracking. In particular, various types of products in various types of companies in the current timber market have a wide range of products and their qualities are uneven. It is suggested that consumers should choose some of the more well-known brands. In addition, the main material should be prepared in advance, and it is better to place it in the room with heating equipment for 3 to 5 days so that the moisture content of the wood is close to the level inside the house so as not to deform in the future.
In addition, after wood is transported into the decoration site, it should be avoided to put it in a ventilated place, otherwise the air drying will quickly lose its internal moisture and cracks appear. When the humidity is low, it is necessary to reduce the tendency of the spring wood to be brittle and cracking may not be visible at the beginning. However, if the paint worker does not seal the oil in time, it can easily cause cracks on the veneer surface of the veneer, which affects the aesthetics and its use. life. For the wood line used as the edge, the moisture content is higher than that of the veneer. After the processing is completed, the surface should be sealed with oil as soon as possible, otherwise shrinkage will occur, which will affect the appearance of the veneer.
Ventilate and place a pot of water near the heating facility to promote evaporation. This will allow the wood to survive the spring.
In the spring when the air is wet, when workers lay wooden floors, expansion joints of about 2 mm are indispensable, otherwise drums and dangling will occur easily in the future. If there is a phenomenon such as leakage of heat from the heater or accumulation of water on the wooden floor, it must be wiped in a timely manner. Do not allow it to be exposed to direct sunlight or baked in an electric oven to avoid excessive drying and cracking of the floor. In order to prevent deformation, the floor on both sides of the wall can be dismantled, and the moisture can be dispersed before reinstalling.
Plastering, scraping, putting on tiles, etc., are susceptible to problems such as emptying. In particular, when painting paint, it is necessary to pay attention to “warmthâ€. After the paint is fully dried, the doors and windows can be opened and ventilated, and sand can not be allowed to fall on the undried paint surface. Whether it is mixing mortar or spraying a variety of paints, it is best not to construct it in the open air and avoid all kinds of stains falling into it.
Experience with three trees paint del floor paint decorating house decoration house floor tile tile price floor tile ld tile
Pneumatic Valve,Pneumatic Check Valve,Pneumatic Gate Valve,Air Actuated Valve
Haogong Valve Co Ltd , https://www.haogongvalve.com