Five precautions for second-hand house decoration

First, do the overall planning

This planning and design is very important to avoid the owners taking some detours during the renovation process.

Generally, before the renovation, the owner needs to be clear whether it is to be partially modified or completely modified. For example, some original layout owners can accept it; or due to budget and Other issues, the owner only makes some partial modifications: for example, water distribution, partial modeling Category. Another way is to overthrow the previous plan, completely remove the dismantled, and start over.

Second, do not move the load-bearing wall

Privately dismantling the load-bearing wall not only has serious dangers, but also violates relevant national regulations. The load-bearing wall is the main bearing body of the house. Once a problem occurs, it will not only suffer economic losses, but may also be subject to legal sanctions. Pay attention to the removable and modified walls, which are detachable and which are not removable. So consult the property before dismantling, because the property will have some structural drawings of the house.

In the absence of drawings, there are doors, there are walls, such walls should not be removed as much as possible; and the wall with a ruler is thicker than the load-bearing wall; these walls of the bedroom must be unloaded by the load-bearing wall. Therefore, before you dismantle the wall, you must find out what is the load-bearing wall and what is the non-bearing wall.

Third, the decoration fund budget

Strict control of the budget, basically in accordance with the budget, there is no big problem. After many people have finished, 90% of them will be over budget. This is too common. Be sure to give yourself a detailed calculation before renovation. And you must be sensible when you buy something. Because many people are often unable to control when they buy materials, they will buy expensive.

The key to controlling the budget excess is that you have to make a strong budget before the renovation. How much money should be made including a lock, and then buy it in strict accordance with the standard. Also have to leave a certain amount of room in the budget: how much money you need, as long as you feel satisfied, you can deduct from the extra money, so that rational consumption.

Fourth, housing design features and precautions

1. There is no “love”. Before most people in the home renovation, they must look at a few "atlas", choose a "love", and "clone" into their home. However, this method is always difficult to achieve at the end, where is the problem? The "model house" in the "Atlas" is often the choice of high and large luxury. The space of the general home is difficult to "reach the standard", so "as usual" has actually become "compressed", and the result is a crowded, oppressive feeling after occupying too much space. The size of the space in your "model map" (in length, width, and height) is best approached by your home.

2, do not casually "exceed the standard, downgrade." When someone chooses the decoration materials, they suddenly feel passionate about some kind of "boutique" or see "cheap goods". Such purchases may cause “inconsistency” in the overall configuration of the home. For example, the high-grade floor will eclipse the mid-range furniture; the low-grade floor will not set the solemnity and luxury of the high-end furniture. Therefore, the decoration must have a holistic vision. It is clear in the heart that your home is positioned in the "high, medium and low" files. The procurement of various materials and articles is also uniform in that grade.

3. Don't be stubborn. In home decoration, there is often a situation in which a family member is dominant. However, the home must not be a personal residence. Before the renovation, the main members of the family must fully negotiate and communicate, and reach a consensus.

In short, the decoration, no matter in the materials, crafts and concepts are constantly developing, so regrets are inevitable, there must be a normal heart.

Fifth, the main material purchase notes

1. The aging water pipe must be replaced.

The original water pipelines of second-hand houses often have many unreasonable layouts. During the renovation, the original waterways must be thoroughly inspected to see if they are rusted or aged. If the original pipeline uses a galvanized pipe that has been eliminated, it must be replaced with a copper pipe, an aluminum-plastic composite pipe or a pp-r pipe.

2, the circuit is not modified

Second-hand houses generally have simple circuit distribution, aging wires, illegal wiring, etc., which can no longer meet the needs of modern households, so they must be completely rebuilt and re-routed during renovation. If the original line is found to be an aluminum wire, it must be replaced with a copper wire of 2.5 square millimeters. For the installation of high-power electrical appliances such as air conditioners, a 4 mm square cross-section line should be set up separately, and a pvc insulated retaining wire tube should be used.

3, three "face" transformation is essential

During the renovation, the renovation of the wall, floor and ceiling of the second-hand house is the most easily overlooked. It is best to ask the professional to conduct on-the-spot investigation of the house to see if there is any obvious crack, whether it is flat, whether it is falling off or sand. If these conditions exist, repairs must be carried out, including the removal of wall oil, powdered wall paint, etc., and the repair of the base layer, cracks and holes with cement mortar. In addition, after repairing, a primer should be applied to cover it to make the base layer firm. Secondly, it can prevent the base layer from changing due to efflorescence and moisture, and then use a scaled emulsion paint to finish. During the construction, attention should be paid to the cleanliness of the site air, and the dust protection should be done. The tools must be free of debris.

4, the old door lock must be changed

The first thing that should be changed is, of course, the door lock. As a second-hand house, it is impossible to know how many people still keep the keys of the old lock in their hands. In addition, you should also pay attention to check whether the doors and windows are aging, if the material is strong, can be repainted. If the paint film on the surface of steel doors and windows falls off and the main body is corroded or cracked, it is best to remove the redo.

5, door and window updates carefully considered

Door and window aging is also a prominent problem in second-hand housing, but if the material is sturdy and you like its style, generally it can be renewed as long as it is repainted, but if the following problems occur, you must remove the redo, the main The problem depends on whether the wooden doors and windows are peeled and deformed. If there is, it means that the characteristics of the wood itself have changed, so it must be replaced. In addition, the paint film on the surface of steel doors and windows is detached, and the main body is rusted or cracked. In addition to being unsafe, it is difficult to restore the original shape. In order not to affect the use effect, it is recommended to remove the redo.

6, second-hand housing should be thoroughly disinfected

There is an important step in the decoration of second-hand housing, which is to thoroughly disinfect. It can be sprayed with 3 percent of Sushui, 1 to 3 percent of bleached water or 3 percent of peracetic acid solution. After closing, close the door and window for 1 hour.

7, waterproof

Before the second-hand house is renovated, the toilet and kitchen should be tested for water storage and leak testing for 24 hours to 48 hours. Check the original waterproofing work. If there is no water leakage, it proves that the waterproofing treatment is done well; if there is water leakage The phenomenon must be re-waterproofed. After the waterproof treatment, wait until the ground is completely dry, then lay the tiles and carry out the overall decoration. Moreover, when the toilet is changed to sit in the toilet, the waterproof treatment of the position of the toilet drain must be done. When designing and decorating the top of the toilet, attention should be paid to the disassembly and assembly, which is conducive to future inspection and maintenance.

PVC shower hose

kaiping aida sanitary ware technology co.,ltd , https://www.kpaidafaucets-jm.com