Tip 1,
Before the tiling, make the wall rougher and better. This will increase the contact area between the cement and the wall. The specific approach is to drill more holes on the wall with an electric drill, and the more the better. Now some of the decoration companies call this a lame. I haven't seen any specific practice, but my bricklayer later told me that the practice is not to deal with the wall, but to roll the glue on the wall first, and then dump the cement. On the wall, after the cement has solidified, it is like a wall in the theater. It is a pothole, and then it is tiled on it. In fact, this does not increase the contact area between the cement and the real wall. I don't contribute much, so I personally think that the idea of ​​pulling wool is a bit fooling people.
Tip 2
When tiling, brickwork must be required to pull the line, supplemented by a horizontal ruler, no matter how good the tile craftsmanship is, how good it feels. It is recommended that you still insist on using tools to control the quality.
Tip 3,
Generally, the bearing wall can be made of cement mortar, but the kitchen flue, bathroom air duct, and kitchen and toilet are required to add 108 glue to the cement mortar to increase tackiness.
Stickers 4,
When the decoration company puts on a tile, the tile union takes a ruler made of a big core board to let you inspect and check it. In fact, the thing is not grounded for a few times, so you can't use it to check the quality of the tiling. , must use a ruler or aluminum alloy for inspection.
Stickers 5,
To prevent empty drums, check that the empty tiles of the tiles can not be knocked on immediately after the sticking. It is better to wait for two or three hours to knock again, paying special attention to the four corners of the tiles. I suggest that you should knock one by one. If you hear empty drums, you must rework. Don't be awkward, because if you do, you will wait until the last installation to strike the tiles. You will know the danger of emptying. If you hit a corner on a tiled tile, you would like to cry.
Tip 6:
The floor of the toilet must be leaked from the slope to the floor, and the gradient should be increased. When the pipeline inside the bathroom is renovated, the original drainage and sewer pipes and floor drain locations should be avoided as much as possible to avoid leakage due to the damage of the waterproof layer caused by the re-arrangement of the cutting floor slab.
Tip 7:
Tiles with seams with toner color match, then it is best to look at a little debugging, and then decide the amount, otherwise not too shallow is too deep.
Tip 8:
The slope of the bathroom floor should be considered before paving, and the slope of the national standard cannot achieve the effect of rapid drainage, and if you use a deodorant floor drain or an ultra-thin floor drain, it will greatly increase the difficulty of drainage.
Tip 9:
Don't shop ordinary tiles because the laundry is not very important, be sure to shop. Cheap tiles, it is easy to absorb water, there will be color.
Tile entrance decoration cement aluminum alloy decoration decoration company look good bathroom tile color bathroom waterproof bathroom tile ceramic tile kitchen tile
Zhejiang Sealand Technology Co., Ltd. is a trustworthy manufacturer of Mass Flow Meter Coriolis, Flow Meter Coriolis, Mass Flowmeter Coriolis, Mass Meter Coriolis, Meter Coriolis, Flowmeter Coriolis, ISO/ IEC 17025 standard.
Sealand meter is certified by Zhejiang Institute of Metrology. To get such certificate, Sealand has to send all models to Zhejiang Institute of Metrology and all models are tested in their calibration lab. The lab is an ISO/IEC 17025:2005 standard lab approved by CNAS (China National Accreditation Service for Conformity Assessment). CNAS is a member of ILAC (International Laboratory Accreditation Cooperation).
Mass Flow Meter Coriolis, Flow Meter Coriolis, Mass Flowmeter Coriolis, Mass Meter Coriolis, Meter Coriolis, Flowmeter Coriolis
Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeter.com