Integrated ceiling air heating type bathroom heater maintenance
1, Yuba power wiring system to be standardized. Yuba power up to 1100W or more, therefore, the installation of Yuba power wiring must be waterproof, it is best not to dry 1mm multi-wire copper wire, all power wiring must take the plastic pipe inlaid in the wall There must be no open-wire setting. The Yuba power control switch must be a qualified product with a waterproof capacity of more than 10A. In particular, the old bathroom installation bathroom should pay attention to specifications.
2, pay attention to the thickness of Yuba should not be too large. In the installation problem, consumers must pay attention to the thickness of the bath can not be too large, generally about 20 cm. Because Yuba is to be installed on the roof, if you want to install Yuba, you must add a layer of roof below the roof. That is, we often say that PVC ceiling or integrated ceiling, so that the latter part of the Yuba can be caught in Between the two tops, if Yuba is too thick, decoration is difficult.
3, the bathroom heater installed in the center of the bathroom at the top, or slightly close to the bath position, this is safe and can maximize the function to play.
4, prohibit the use of water spray at work bath. In the use of special attention should be paid: Although the current bathroom heater is waterproof, but in practice can not be used to splash water, although Yuba waterproof bulb waterproof, but the metal parts of the body can not do this, That is, the metal in the body is still conductive, and if it is splashed with water, it will cause a danger such as a short circuit to the power supply.
5, avoid frequent switching and vibration around. Usually do not use the switch frequently Yuba, Yuba operation should not be surrounded by a larger vibration, otherwise it will affect the life of heating foam. If there is an abnormal situation during operation, it should be stopped immediately, and it must not be repaired and repaired on its own. It must be overhauled by the professional technicians of the after-sales service department.
6, to keep the bathroom clean and dry. After bathing, do not switch off the bath immediately, and wait until the moisture in the bathroom is drained before shutting it down. Always keep the bathroom ventilated, clean and dry to increase the service life of the bath.
Integrated ceiling air heating type bath heater cleaning and maintenance techniques and collocation methods
Ceilings Integrated ceilings Integrated ceilings Electrical bathroom switches Interior renovation House decoration House decoration style Bathrooms Waterproof toilet ceilings Bathroom doors
Hand Tool Set,Mechanic Tool Sets,Household Tool Kit,Household Hand Tool Sets
SUZHOU NEWSTAR HARDWARE CO.,LTD. , https://www.hardwarenewstar.com