Wall-mounted bathroom cabinet installation process and details sharing

The installation of wall-mounted bathroom cabinets is more complicated, and most consumers will directly choose the door-to-door installation service provided by the store. However, as the saying goes, "There is no need to prepare for it." If you know the installation knowledge of some bathroom cabinets, you can check the installation master's business ability even if you are a "hands-on shopkeeper".

First, the wall-mounted bathroom cabinet installation process

First check whether the wall is solid (otherwise use the floor type), press the selected hole position, punch the wall with the impact drill (installed the table surface 83cm from the ground), load the plug in the wall accessories In the hole, use the self-tapping screw and wire to lock the cabinet and the cover. It can also be installed with expansion screws. After the cabinet is installed, the table basin is aligned with the raft of the chess board, and the level is adjusted.

Second, wall-mounted bathroom cabinet installation details

1, the installation location

Before laying the floor tiles and wall tiles, it is necessary to confirm the installation position of the bathroom cabinets. Since the installation of the bathroom cabinets is to be perforated in the wall, the water inlet holes and the drainage holes are also required. Once installed, the position cannot be moved. Therefore, it is necessary to confirm the installation position of the bathroom cabinet before installation.

2, the shape and size of the bathroom cabinet

After the position of the bathroom cabinet is determined, the shape and size of the bathroom cabinet can only be determined according to the installation position. When buying a bathroom cabinet, you should first measure the length and width of the reserved bathroom cabinet and buy it according to this size.

3, the pipeline diagram of the water pipe and the wiring diagram of the wire

It is necessary to punch holes in the wall with the air drill, so it is very important to confirm the pipeline diagram and circuit diagram before installation. If the water pipe or wire circuit diagram is broken, some wall tiles will be opened, causing unnecessary losses.

4. Follow the instructions to install

The accessories and installation of each bathroom cabinet are different. The punching size of the same model (the size of the hole to the wall) is not the same, so you can generally follow the instructions, but the installation process is basically the same.

Pre-installed Integrated House

HTB1E59OcC3PL1JjSZFxq6ABBVXai.jpg__2021-08-17_11_32_32_2021-08-17_11_37_47

Pre-Installed Integrated House,Integrated House,Pre-Installed House,Pre-Installed Integrated House For Sale

Taiyaun JDS Machinery And Equipment Co., Ltd. , https://www.jdsmachine.com