1. The equipment should be installed in a dry place as much as possible (a 30-cm deep trench around the room should be used to facilitate the discharge of waste water) because long-term exposure to moisture can cause damage to electrical equipment and components.
2. The system should be placed in a place convenient for operators to enter and maintain, and there should be more space around.
3, choose the installation site time should take into account as much as possible the entire system has a suitable location, and in line with the process flow of operation placement.
3. After the pre-treatment and the host are in place as required, use Upvc, ABS or stainless steel pipe to connect. A sewage outlet (security filter entrance) should be installed at the entrance of the host.
4. Each pipe network is an important part of the system. The installation must be performed by a professional installation company. The pressure loss caused by the branch pipe network is not the content served by this system.
5, the installation of electrical appliances must be carried out by qualified electrical technicians and workers, must have a reliable grounding.
6. Please reserve 380V and 220V total terminals for the main control room.
7, the installation site should ensure that the summer temperature is not higher than 45 °C, winter is not less than 4 °C, otherwise it will cause irreparable damage to the equipment.
8. The height of the pure water collection point (such as the inlet of the pure water tank) should not be higher than 1.5m of the pure water outlet of the equipment. Otherwise, back pressure will be generated on the reverse osmosis membrane, causing irreparable damage to the reverse osmosis membrane. It is recommended to install a check valve in the pure water pipe during the installation of the project to effectively prevent back pressure on the membrane.
9, the pure water outlet connection pipeline can not install the valve and any device hindering the outflow of pure water.
10. The diameters of the pure water connecting pipe and the concentrated water discharging pipe should not be smaller than those of the pure water outlet and the concentrated water outlet.
11, electrical installation details see the instructions of each device.
12. If the raw water is tap water and there is no original water tank, the pretreatment is a glass steel tank. It is recommended to install a one-way valve at the front end of the pretreatment. Prevent negative pressure from breaking the FRP cans.
There are three types of Dip switch led batten lights, Change CCT Light, Change Power Light, and Change CCT and Power light.
In other words, this batten light can change the color temperature and power. It is mainly possible to change the color temperature and power by turning the DIP controller inside the lamp body. Moreover, you only need to press the button on the side of the light to open the light body, which is very easy to operate.
The function of changing color temperature and power is very suitable for stock. Before shipping, you can set the color temperature and power that your customers want.
The adjustable range of color temperature is: 3000k/4000k/5000k, 4000k/5000k/6000k.
The power adjustment range is: 5 /10 /15 /20, 5 /15 /25 /30, 10 /20 /30 /40, 10 /25 /40 /50, 10 /25 /40 /50, 20 /30 / 50/60.
This batten light is suitable for warehouses, shops, corridors, offices, factories, and other indoor places.
Shop Led Light Fixtures,Workshop Led Light,Shop Light Fittings
SHENZHEN LITEHOME OPTOELECTRONIC TECHNOLOGY CO., LTD. , https://www.litehomelight.com