Industry experts know that waterway reconstruction causes and processes

>>>illustration: How to handle the waterproof layer after it is destroyed?

Create a personalized water environment based on the population and water use habits of each family.

There are more tricks and each one is different. General methods:

1. Change the pipe from the pipe to the pipe and bury it in the pipe.

2, install hot water pipes. Households that use gas water heaters lead the pipelines to the bathroom; homes that use electric water heaters place water heaters in the bathroom and kitchen, and then pick up hot water pipes nearby. Note: The PPR pipe is divided into hot and cold water pipes, the corresponding pipe wall and pressure resistance are different, the hot water pipe wall thickness

3, change the position of the valve water meter, water pipe valve to change the low, - or even wrap up, which brings some hidden dangers in the future maintenance and work, it is recommended: the total water valve in a better open position. Such as the table, the pipe behind the valve to do low processing; washing machine to move the floor or faucet lead the balcony to wash the mop, watering; water meter high to change the low, --- that rely on the wall to save space, but after putting the cabinet is very Difficult to overhaul and view, the correct way is: by the cabinet, a low vertical wall installation.

4, install purification equipment. Reserve purification equipment branch interface until the end of the renovation, cabinets installed in place, please water purifiers, softener manufacturers come to install water purification equipment. It is generally installed in the space under the sink, so the kitchen cabinet partition where the sink is located should be large enough, such as 80 cm wide.

5. Change the heating pipe and move the radiator to the position where the furniture is conveniently placed, such as under the window sill.

6, solar (hot water) transformation of top-end tenants, set aside for the installation of solar water heaters required pipeline interface

The first step, you discuss the specific direction of the waterway

In the second step, fix the clip to the wall with a hammer

The third step, start the hot melt connection of the pipe with a dedicated hot melt machine

The fourth and most important step is to use a pressure test pump to pressure the entire pipeline after connecting.

The fifth step is to clean the debris left over from the site to avoid affecting the work below.

Hydroelectric Renovation Space Heating Gas Water Heater Electric Water Heater Toilet Decoration Partition Door Partition Cabinet Household Cabinet Cupboard Door Kitchen Cabinet Door Kitchen Bathroom Ceiling Bathroom Door Toilet Partition Toilet Ceiling Toilet Waterproof Bathroom Leakage

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Coffee Maker

Instant Coffee Maker,Expressi Coffee Machine,Small Coffee Maker,Coffee Machines For Home

Ningbo DeNeu Imp. & Exp. Co., Ltd , https://www.deneucn.com