Many young people pursue a sense of fashion and comfort, so solid wood flooring is the best choice. There is an old saying on the floor, a three-point floor, and seven points of installation. It can be seen that it is installed in the floor. Today, Xiao Bian introduced the installation of the floor. Preparation and construction points.
A preparation before construction 1, floor installation before the need to do the ground dry, smooth, no obvious bumps.
2. Determine the direction of the ground pipeline and mark it. 3, floor tiles, room doors and other processes to be set up when the installation of the floor size (usually floor thickness plus keel thickness). 4, after the arrival of the floor must be accepted, the contents include: whether consistent with the goods ordered, packaging, quantity, grade, color, board surface are all need to pay attention, especially whether the corners of the floor bump phenomenon.
2. Construction points 1. The ground level is maintained as a whole and thoroughly cleaned to facilitate the next process.
2, construction lined, use the ink line for marking, keel spacing according to the length of the floor, the principle is divided according to the length of the floor, but the maximum does not exceed 400mm; keel length direction interval 400 ~ 450mm position bomb a line. 3, according to the intersection of the scribe line for drilling (the depth of the hole is 40 ~ 60mm), then nailed into the cork, cork to fully fill the hole, and to clean up the ground again.
4. The keel is usually dry pine coniferous wood and the keel is fixed to the ground with a nail. After the keel is laid and fixed, the leveling treatment is required. The surface of the keel needs to be on a horizontal surface (when the liner needs to be laid, it can be laid on this basis). 5. The moistureproof film is laid on the keel, and the interface of the moisture proof film needs to overlap 200mm. In the middle of the keel spacing, some insect repellents can be spread evenly.
6. Use a special floor nail to fix the floor and keel in a direction of 45 degrees. Fix the contact of each floor and keel, and leave 8 to 10 mm of joints between the floor and the wall. 7, after the floor pavement is completed, install the connecting pieces (buckles, flat buckles, height difference buckles, Yang corner buckles and closing mouth bars) and baseboard.
Although basically flooring companies will provide installation services, it is not a bad idea to know more about them and it is more convenient to supervise them.

2. Determine the direction of the ground pipeline and mark it. 3, floor tiles, room doors and other processes to be set up when the installation of the floor size (usually floor thickness plus keel thickness). 4, after the arrival of the floor must be accepted, the contents include: whether consistent with the goods ordered, packaging, quantity, grade, color, board surface are all need to pay attention, especially whether the corners of the floor bump phenomenon.
2, construction lined, use the ink line for marking, keel spacing according to the length of the floor, the principle is divided according to the length of the floor, but the maximum does not exceed 400mm; keel length direction interval 400 ~ 450mm position bomb a line. 3, according to the intersection of the scribe line for drilling (the depth of the hole is 40 ~ 60mm), then nailed into the cork, cork to fully fill the hole, and to clean up the ground again.
Floor installation solid wood flooring installation